生物脫硫系統(tǒng)一系統(tǒng)運(yùn)行前檢查
Pre operation inspection of biological desulfurization system I
檢查沼氣流經(jīng)系統(tǒng)的各閥門(mén)控制情況,開(kāi)和關(guān)要到位。
Check the control status of each valve in the biogas flow system, and ensure that the opening and closing are in place.
檢查循環(huán)水管路上的閥門(mén)正確使用情況。
Check the correct use of valves on the circulating water pipe.
檢查各儀表,儀器是否完好,有無(wú)漏氣、漏水存在,能否正常運(yùn)行。
Check whether all instruments are in good condition, whether there are any air or water leaks, and whether they can operate normally.
檢查每個(gè)用水點(diǎn)水位,系統(tǒng)嚴(yán)禁缺水運(yùn)行。
Check the water level of each water point, and the system is strictly prohibited from running short of water.
二運(yùn)行中注意事項(xiàng)
II. Precautions during operation
設(shè)備啟動(dòng)前在控制柜觸屏上要確定與之相對(duì)應(yīng)的設(shè)備按鍵。
Before starting the device, it is necessary to determine the corresponding device button on the touch screen of the control cabinet.
循環(huán)水泵開(kāi)啟后,應(yīng)觀察水泵是否上水,壓力表正常穩(wěn)定。
After the circulating water pump is started, it should be observed whether the water pump is filled with water and whether the pressure gauge is normal and stable.
各設(shè)備啟動(dòng)后,注意機(jī)器聲音、電流、振動(dòng)情況、溫度、螺絲是否松動(dòng)。
After starting each device, pay attention to the machine's sound, current, vibration, temperature, and whether screws are loose.
每天按時(shí)用手持式檢測(cè)儀測(cè)生物脫硫后H2S三--四次。
Use a handheld detector to measure H2S after biological desulfurization three to four times a day on time.
營(yíng)養(yǎng)鹽計(jì)量泵,氫氧化鈉潛污泵24小時(shí)應(yīng)有正常工作水位,兩桶加水時(shí)不要讓液體溢出桶外。
The nutrient metering pump and sodium hydroxide submersible sewage pump should have a normal working water level within 24 hours, and do not allow the liquid to overflow when adding water to two buckets.
曝氣池水溫控制在32℃-35℃,堿法脫硫PH值控制在8-8.5之間,氧化還原電位在-320--260mv之間。
The water temperature of the aeration tank is controlled at 32 ℃ - 35 ℃, the PH value of alkali desulfurization is controlled at 8-8.5, and the oxidation reduction potential is between - 320 and 260mv.
三維護(hù)保養(yǎng)
3D Care
每天將系統(tǒng)內(nèi)冷凝水排水閥放空。
Empty the condensate drain valve in the system every day.
嚴(yán)格執(zhí)行交接班制度,并做好設(shè)備安全運(yùn)行記錄、各項(xiàng)指標(biāo)參數(shù)記錄。
Strictly implement the handover system and keep records of equipment safety operation and various indicator parameters.
定期對(duì)設(shè)備除塵,潤(rùn)滑,防銹(一個(gè)月一次),保持環(huán)境干潔。
Regularly dust, lubricate, and rust the equipment (once a month) to maintain a dry and clean environment.
每天往洗氣水箱注水15分鐘,達(dá)到臟水置換作用,一個(gè)月整體換一次水.
Fill the gas washing water tank with water for 15 minutes every day to achieve the effect of replacing dirty water. Change the water as a whole once a month
本文來(lái)自:
生物脫硫更多的內(nèi)容請(qǐng)點(diǎn)擊:
http://ttzdb.com我們將會(huì)為您提問(wèn)的問(wèn)題提供一個(gè)滿意的服務(wù),歡迎您的來(lái)電!
This article comes from: For more information on biological desulfurization, please click on: http://ttzdb.com We will provide a satisfactory service for the questions you ask. Welcome to call us!